Name:

Pittsburgh International Airport Terminal Energy Plan Boiler Control Replacement

Location:

Moon Township, PA

Facts:

The Energy Plan Boiler Control Placements Project at Pittsburgh International Airport consisted of upgrades and revitalization to the four-boiler energy unit system that provides the heating system for the entire airport facility and its supporting structures, as well as providing new logical sequencing for the upgraded programmable controllers. The upgrades also enabled the existing plan to be utilized at another Wellington project – PIT’s Terminal Modernization Project.